Step #2: Connect all cameras cables, monitor output cables and networking cable as required for the installation. Install DVR is designated Rack or wall mount in specified location. Insure all drive bays are completely closed and locked before continuing with the installations. 2 P a g eģ Section 1.Edge VR300 Hardware Installation Step #1: After removing the NVR from the box, unlock the hard drive bays and pull the HDD out approximately 1 inch and re-seat the drive into the bay, repeat this for each Drive. Programming may be adjusted by EMC or KeyBank Personnel only after initial install and acceptance. ATM IP: Section 1.Edge Hardware InstallationĢ Section 2.Edge Initial Set up Section 3.Edge Camera Setup and Labeling Section 4.Edge Events and Surveillance Section 5.Edge ATM Interface Device Set up Section 6.Edge Monitor Output Set up Section 7.Edge Motion Set up Section 8 Edge Camera View Standards Section Edge Test and Acceptance Section 10 Installation Responsibilities All settings in this guide are for DVR startup. Prior to install you will need the following information.

Edge-VR Firmware or higher is required to program the Edge NVR for KeyBank.

1 Date: March 2017 Edge- NVR - Verint NVR Programming Guidelines/Test and Acceptance Installation is to be performed by a Verint EDGE Certified Installer using Vid-Center Software 7.1 or higher.